Apollo 6301 had a successful sea trial at open sea near by Pearl river
Apollo 6301 had done the 3rd sea trial at open sea near by Peal River successfully on Aug 26.
Sea trial report shown below:
Water tank capacity: Full load (1500L)
Fuel tank capacity: Full load (2100L)
Holding tank capacity: Full load(600L)
Sea trial peoples: 26 peoples
Sea condition: A little rough (1.M-1.2M), two days after typhoon.
New propeller: 33" *33"*4B*1.00NACA
Sea worthiness: Excellent
Running angle: Excellent
Wake condition: Excellent
Breaking wave performance: Excellent
| Port Engine (RPM) | Starboard Engine (RPM) | Speed (Knots) |
| 1618 | 1619 | 13.1 |
| 1703 | 1706 | 14.0 |
| 1812 | 1813 | 16.5 |
| 1906 | 1908 | 18.2 |
| 2002 | 2002 | 19.3 |
| 2102 | 2103 | 21.5 |
| 2352 | 2353 | 25.1 |
| 2370 | 2360 | 25.4 |





